How should you compare building utilization across hours and time zones?

Make cross-site utilization comparisons reproducible through local schedules, consistent denominators and visible coverage.

Conceptual illustration of two office buildings under different local daylight conditions.

Density Atlas exports retain the locations, capacity and local timestamps behind a building comparison. The export documentation describes reporting across space, floor, building and portfolio selections. An analyst can use those fields to check which locations and periods a comparison includes.

Two offices can show different utilization rates because their opening hours differ, even when they have identical occupied time.

Decide which comparison informs the decision

For space planning, compare equivalent local working days. For a question about simultaneous global demand, align observations to the same instants instead. These answer different questions; name the chosen convention in the report.

For each site, record its timezone, local date range, operating hours, excluded holidays, usable capacity and included floors. Compare similar space functions before combining them. A building dominated by meeting rooms serves a different purpose from one dominated by desks.

Density's floor analytics guide documents operating-hour filters and removing individual calendar days, including holidays. Your team should agree which exclusions belong in the comparison and retain that list with the result.

A worked comparison: equal use, different denominators

In this hypothetical example, consider one floor in each of two buildings on October 20, 2026. Observations are complete. Each floor has exactly four people present from 10:00 to 14:00 local time and zero people throughout its remaining opening hours.

Input Floor A Floor B
Timezone America/Los_Angeles America/New_York
Local opening hours 09:00–17:00 08:00–18:00
Available seats 20 40
Occupied time 4 hours 4 hours
Available time 8 hours 10 hours
Occupied-time rate 4 ÷ 8 = 50% 4 ÷ 10 = 40%
Person-hours 4 × 4 = 16 4 × 4 = 16
Available seat-hours 20 × 8 = 160 40 × 10 = 400
Average capacity utilization 16 ÷ 160 = 10% 16 ÷ 400 = 4%

Occupied-time rate asks how often a floor has anyone present during its available hours. Average capacity utilization asks how much available seating is used over that window. Both are valid; they describe different aspects of demand.

For a common 09:00–17:00 local-hours comparison, occupied-time rate becomes 50% on both floors. That answers how often they are used within the same local schedule. The original 50% and 40% answer how often each is used during its own opening hours. Keep both views when evaluating whether opening hours or seating supply deserves investigation.

Keep local dates and coverage visible

Atlas exports identify LOCAL_DATE_TIME as adjusted for the space's timezone. The API reference labels the All Metrics endpoint's input range as local time and its end as inclusive. Check the chosen endpoint's contract rather than assuming every API uses the same boundaries.

Before combining exports, preserve timezone information alongside local timestamps. Check daylight-saving transitions in the selected period and use actual elapsed durations for weighted calculations. Agree these analysis rules with Density for your portfolio.

Keep missing intervals separate from observed zero occupancy. Declare a coverage rule, disclose excluded intervals and report coverage beside each rate. A partly observed day can otherwise appear quieter than a fully observed one. Density documents up_time as a data-quality signal; confirm how your selected report handles incomplete buckets.

Did use change, or did the mix of days change?

A before-and-after comparison can move in the wrong direction when the selected periods contain different proportions of busy and quiet weekdays. Match the days as well as the hours before deciding what changed.

Consider this hypothetical office with 100 usable seats and complete observations during the same eight operating hours on every selected day. Within each period, assume the average occupancy is the same on every selected Tuesday and the same on every selected Friday.

Input Before the policy change After the policy change
Average Tuesday occupancy 80 people 90 people
Average Friday occupancy 20 people 30 people
Selected observation days Four Tuesdays, one Friday One Tuesday, four Fridays
Average occupancy across selected days 68 people 42 people
Average capacity utilization across selected days 68% 42%

The pooled result suggests a decline, even though use increased on both weekdays. The earlier period contains more busy Tuesdays; the later period contains more quiet Fridays. Across equal-duration days, the calculations are (4 × 80 + 20) ÷ 5 = 68 and (90 + 4 × 30) ÷ 5 = 42.

Give Tuesday and Friday equal weight in both periods and the comparison becomes 50% before and 60% after. This is a standardized Tuesday–Friday comparison, not a whole-week utilization estimate. Choose weights that fit the decision, then keep them fixed across periods. Also show the weekday results so the combined percentage remains explainable.

Density's floor analytics lets you select dates, operating hours and weekdays; its CSV exports retain location identifiers and local timestamps. Use those controls to establish comparable selections, then calculate the fixed-weight comparison from the exported data.

A matched comparison describes what changed. It does not, by itself, prove a hybrid-work policy caused the change. Check for concurrent changes in staffing, capacity, space boundaries and observation coverage before attributing the result to a policy.

Evaluate Density with two real sites

Bring two buildings with different schedules to a demonstration. Ask for the selected floors, local dates, capacity assumptions and exclusions to remain inspectable when the comparison is exported. Reconcile one day by hand before using a portfolio ranking to prioritize space changes.

Book a Density demo, or email sales@density.io with the buildings and decision you want to compare.

Use the metric definitions beside the comparison. Before combining room peaks, work through the simultaneous-occupancy example.

Browse occupancy guides and sensor comparisons · Read the plain-text version

Tags:

Table of Contents

Key Takeaways

DisruptCRE founder shares how corporate real estate is changing

DisruptCRE founder shares how corporate real estate is changing

Companies are moving employees from underutilized offices into "space as a service” options with utilization data.

Watch now

Most recent

What is a good office space utilization rate?

What is a good office space utilization rate?

A useful utilization target depends on the space, denominator and busiest-day needs. Learn how to set a target your workplace can act on.

Looking for an occupancy analytics platform to optimize your office space?

Looking for an occupancy analytics platform to optimize your office space?

Choose a platform around the space decision, sensor coverage and reporting workflow. Use a practical pilot to test the evidence before a rollout.

How do you manage hot desking in a hybrid office?

How do you manage hot desking in a hybrid office?

Plan shared desks around actual demand, make the rules easy to follow, and measure availability alongside employee experience.

How can radar sensors help optimize office space?

How can radar sensors help optimize office space?

Measure how rooms and desk neighborhoods are used, test a layout change, and compare results before committing to a larger redesign.

Explore other Density Products

Atlas

A visual insights dashboard that tells you how your space is performing.

Learn more

Atlas for Workplace

Insights for the workplace that help you cut costs and deliver better spaces.

Learn more

Live Wayfinding

A real-time map of available spaces, built for employees.

Learn more

Density Advisory

Your partner in turning complex workplace data into actionable strategy.

Learn more